Archive for April, 2021

Amtrak Anniversary Saturday: The Greatest Travel Advance Since the 747

April 30, 2021

Over the course of five decades, Amtrak has written a lot of chapters in its history, some of which largely have been forgotten or were never widely known.

One of those is illustrated in the photograph above made in Joliet, Illinois, in 1974 by Robert Farkas.

In Amtrak’s early years it was limited as to what it could do to improve intercity rail passenger service.

It could tinker with schedules somewhat, but much of its fate was in the hands of its contract railroads, which employed the operating and onboard personnel associated with the trains. In essence the freight railroads ran the trains and sent Amtrak the bill.

One opportunity to show that Amtrak was doing something to “make the trains worth traveling again” as the marketing slogan went, came in late 1972.

The French company ANF-Frangeco was building 16 sets of turbine-powered trains for the French National Railways.

The latter agreed to lease to Amtrak sets 9 and 10 with an option to buy.

The first Turboliner arrived in Chicago on Aug. 11, 1973. The red, white and blue train was billed by Amtrak in more than a bit of hyperbole as being perhaps the greatest advance in travel since the 747.

An Amtrak advertisement described the Turboliner as “the jet train that glides down the track . . . so smoothly you can hardly feel the rails.”

The Turboliner made a publicity run between Chicago and Bloomington, Illinois, on a rainy Sept. 28, 1973, piloted by Wilton V. Hall, whose father had been the engineer of the first diesel-powered train from Chicago to Bloomington, Illinois, on the Alton Route in the 1930s.

Revenue service for Amtrak’s Turboliners between Chicago and St. Louis began on Oct. 1.

That month the Chicago Tribune sent three reporters on a “race” from Tribune Tower to the Chase Park Plaza Hotel in St. Louis.

One reporter flew out of Midway Airport and went the distance in three hours, 15 minutes. A second reporter rented a car and drove to St. Louis, arriving at the hotel in five hours, 20 minutes.

The third reporter took Amtrak. He was delayed leaving Union Station by eight minutes and his train stopped in a siding three times. He arrived at the hotel in six hours, 14 minutes.

The Turboliners received a lot of attention, but also displeased many because of their narrow seats that reclined very little, narrow aisles, and doors that could be difficult to open.

With a fixed consist, some passengers had to stand on days when more people boarded than there were seats and some passengers were turned away.

Capable traveling 125 miles per hour, the top speed on the now Illinois Central Gulf route was 79 p.m., although the Turboliner running time was a half-hour faster than convention equipment on the Chicago-St. Louis route.

The Federal Railroad Administration rejected Amtrak’s bid to operate the Turboliners at 90 mph because of their superior braking ability.

In its decision the FRA said the route lacked an automatic train stop or cab signal system. At the time the FRA made its ruling, a series of grade crossing collisions involving Turboliners had received widespread news media attention even though no one had been killed or seriously hurt in any of those incidents.

Amtrak ordered additional Turboliners and placed them in service in the Chicago-Detroit corridor in April 1975. Unlike the Turboliners used on the St. Louis run, the Michigan Turboliners had drop down tables and more luxurious reclining seats.

The Turboliners were credited with driving an immediate sharp increase in ridership on the Detroit route.

Amtrak President Paul Reistrup would testify at a congressional hearing that Amtrak was fortunate to be able to buy something off the shelf that was flashy, had large windows, and looked like it was going a million miles an hour when in reality it was actually doing 60 on well-worn Penn Central rails.

As occurred on the St. Louis route, the fixed capacity of the Turboliners of slightly less than 300 led to standees on busy travel days.

On the St. Louis route, the Turboliners were replaced for a time with conventional equipment and then Amfleet cars when those became available in late 1975. A similar process played out on the Detroit line although Turboliners continued on some Michigan trains into the early 1980s.

The Chicago-Toledo Lake Cities, which operated via Detroit, had Turboliner equipment in its early days, making it the only Amtrak train in Ohio to ever be turbine powered.

Turboliners also lasted in the Midwest on the Chicago-Milwaukee route into the 1980s. Another generation of turbine trains, built in California under license saw service on the Empire Corridor for several years and would be Amtrak’s last turbine powered trains.

While living in Springfield, Illinois, in the middle 1970s, I often saw and a few times rode the Turboliners. They were nice, but I preferred Amfleet coaches after they came along.

I even rode the Lake Cities when it still had Turboliners and rode on the Milwaukee line once in a Turboliner in 1980, my last time aboard one.

They rode fine, but I could always feel the rails. Nor did they glide down the track as the advertisement claimed. As for the interiors, I liked those large windows. The cafe section, though, was way too small.

I still remember radio jingles for the Turboliner when they went into service with a chorus singing the line, “hitch a ride on the future (pause) with Amtrak.”

The Turboliner may not have lived up to its billing as a high-speed conveyance but it did for a time enable Amtrak to achieve the objective of offering something new that promoted the appearance of the passenger carrier doing something to improve intercity rail travel after years of neglect, benign or intentional.

Turboliners were not Amtrak’s future but a transition step toward the Amfleet era, which is still very much with us today more than 45 years after it began.

Article by Craig Sanders, Photograph by Robert Farkas

Amtrak Anniversary Saturday: A Photo Tribute to 50 Years of Amtrak

April 30, 2021

With Amtrak’s 50th anniversary being Saturday I’ve selected a small sample of Amtrak in each decade. Over the years I’ve ridden many trains throughout the country either myself or with family and friends. So many that I rode I also photographed trackside at some point.

For the 1970s, here is the westbound Lake Shore Limited at Madison in July 1977.

For the 1980s, I’ve chosen the Lake Shore Limited again, this time headed eastward in Cleveland on Aug. 29, 1984.

The 1990s tribute is the California Zephyr eastbound in Byers Canyon of Colorado on June 28, 1988. I also included the Vermonter northbound at Hartford, Vermont in fall 1998, and the eastbound Southwest Chief in Albuqerque on May 6, 1991.

For the 2000s I present the Empire Builder eastbound at Red Wing, Minnesota, on June 19, 2002; and the westbound Maple Leaf at St. Johnsville, New York, on Sept. 7, 2002.

For Amtrak’s fifth decade here is the eastbound Empire Builder at East Glacier, Montana, crossing Two Medicine Bridge on July 23, 2016, and the eastbound Pennsylvanian at Summerhill, Pennsylvania, on May 18, 2019.

Now, about that image of No. 49 made in Madison in 1977, yes, it has some flaws.

Here is how Ed explained those: “Believe it or not that is the only Amtrak photo I took in the ‘70s of an Amtrak train.

“Back then I used my Dad’s camera, which was not a 35 mm film camera. The shot was either the first or the last on the negative and when we got it back a giant staple was in it.

“I did not take many photos back then since I shot a lot with the regular 8 mm movie camera.

“I have more movies at that same location. What was always tough with the photos back then was when No. 49 came hrough Madison [I] was looking directly into the early morning sun.

“Amtrak had the early year flaws just like my photo.”

Photographs by Edward Ribinskas

Amtrak Anniversary Saturday: Where Were You and What Were You Doing May 1, 1971?

April 30, 2021

Where were you on May 1, 1971? Did you do anything to observe, document or celebrate the transition between freight railroad operation of intercity passenger trains and Amtrak operation?

Maybe you were too young to remember or to have been aware of the day that Amtrak began. Or maybe you had yet to be born.

I was a senior in high school on the day Amtrak started. It was a Saturday just as the 50th anniversary this year is falling on a Saturday.

At the time I was living in Mattoon, Illinois, which would be a stop for Amtrak trains operated between Chicago and New Orleans, and Chicago and Carbondale, Illinois.

I recall seeing from my backyard the first New Orleans-bound Amtrak train from Chicago.

I was disappointed that it looked exactly like the Illinois Central City of New Orleans of the day before with locomotives and passenger cars wearing IC chocolate brown and orange with yellow striping.

Like all teenagers I was naïve about how the world worked. I had read in newspapers about this new Amtrak operation that was to begin on May 1.

Yet I was expecting the trains to look quite different than they had. In fact, it would be more than a year before I saw a passenger car or locomotive that had been repainted into Amtrak’s livery.

Aside from seeing the first Chicago to New Orleans Amtrak train I also saw the last IC passenger train to complete its final journey.

The last northbound City of New Miami had left its namesake city on April 30. Trains that left that day were to continue to their terminus.

Therefore, the last pre-Amtrak train to finish its trip that was not slated to be part of Amtrak would not halt for the final time until May 2.

The City of Miami would not be joining Amtrak. Instead, it passed through Mattoon around 3 p.m. just as it had for many years and rolled into history. The number of trains making their final runs was a major focus of news coverage of the coming of Amtrak.

Sometime that summer cars from other railroads began showing up in the consists of the Amtrak trains that served Mattoon.

It had always been a thrill for me to see whenever I could passenger cars from other railroads. It wasn’t something I got to see often.

That June, I began college although I wouldn’t begin living on campus until late August.

I sometimes saw Amtrak trains during my trips home and during school breaks and made mental notes as to how they had changed or not changed.

My first opportunity to ride an Amtrak train did not come until late 1972.

In looking back I recall having had a sense of something historic occurring but I’m not sure I realized the gravity of it.

I wish now I could have done more – far more, actually – to have experienced and documented those historic days.

But I didn’t have a camera, didn’t have much money, and didn’t have anyone who could have taken me to ride and/or photograph trains in their final hours.

Besides, I was in school and the only time I might have been able to do that would have been on weekends.

So I just followed what was happening by reading about it in the newspapers. I did, by the way, save some of those newspaper stories from April 30 and May 1.

Fifty years later I’ve ridden most Amtrak routes at least once and made thousands of photographs of Amtrak trains and related operations.

More than a decade ago I started collecting Amtrak system timetables and have a nearly complete set.

In fact the last printed Amtrak system timetable still sits on my desk. Dated Jan. 11, 2016, I refer to it often when looking up information for stories I’m writing about Amtrak.

My collection also includes some Amtrak memorabilia, including dining car menus, annual reports, and route guides.

My Amtrak photo collection may be vast, but not nearly as comprehensive as I wished that it was.

I wish I had photographed more or had the opportunity to photograph more widely during Amtrak’s first decade, which I still consider the most interesting one in its history.

Much of my collection of things Amtrak was prompted by my research for a book that was published by Indiana University Press in 2006 titled Amtrak in the Heartland.

I have had a keen interest in Amtrak since it began, probably because I’ve always had a passion for passenger trains.

In many ways, the company that calls itself America’s Railroad and I came of age at the same time and have grown older on parallel tracks.

I can’t remember a day when I wasn’t interested in Amtrak and can’t envision a time in which my interest in the history and current day affairs of the carrier will ever wane.

So, happy anniversary Amtrak; it’s been quite a ride we’ve had together.

Commentary by Craig Sanders

Awaiting its End

April 30, 2021

It’s the late 1960s at the New York Central Bridge Yard in the Collinwood facility in Cleveland where NYC F3A No. 1635 awaits its end. Built in April 1948, we don’t know how it wound up getting smashed in like this.

Photograph by Robert Farkas

Amtrak Sends Congress its Wish List

April 30, 2021

Amtrak sent Congress its wish list this week for fiscal year 2022 funding and it is quite ambitious, seeking to nearly double what Amtrak received before 2020.

The requests include funding for new corridor services, hints at expanding the frequency of operation of the Cardinal and Sunset Limited, and seeks “bold” funding for Northeast Corridor and other capital projects.

The intercity passengers carrier wants a FY2022 grant of $3.88 billion for base needs and funding to offset the pandemic’s impacts on Amtrak and its state and commuter partners.

Also requested was $1.55 billion for Northeast Corridor infrastructure projects and development of new corridor routes across the nation.

In a statement, Amtrak CEO William Flynn noted that Amtrak will soon place into service new Acela equipment and locomotives for long distance trains.

Flynn said that granting Amtrak the funding it seeks would enable it to “play a central role” in helping the nation’s economy recover from the pandemic.

The funding requests are contained in a 77-page General and Legislative Annual Report and Fiscal Year 2022 Grant Request.

As reported earlier, Amtrak proposes to pick up all of the capital and operating costs for the first two years of operation of any new multi-frequency corridor.

But state and local governments would be expected to pay at least 10 percent of costs in the third year, 20 percent in the fourth, and 50 percent in the fifth.

In the sixth year state and local governments would be responsible for all costs as allocated uniformly under Section 209 of the Passenger Rail Investment and Improvement Act.

However, Amtrak believes that the corridor operations will earn enough revenue after five years to make continued operation attractive.

The funding for new corridor services could also be used to support increases in service frequency for less-than-daily long distance routes and certain specific investments in corridor service at no long-term cost to Amtrak’s state partners.

The latter could include service to Canada and Mexico. All of Amtrak’s service to Canada is currently suspended due to the COVID-19 pandemic.

The request mentions that Amtrak’s funding request also reflects funding needed to buy replacement equipment for Amtrak’s Superliner and Amfleet II fleet.

Amtrak earlier this month named Siemens to build 83 transets to replace Amfleet equipment but that is not thought to include Amfleet II cars.

Elsewhere on Amtrak’s wish list is federal legislation to give it a right to sue its host railroads for failure to provide dispatching preference for passenger trains and give the Surface Transportation Board authority to determine whether additional trains on a given route “would unreasonably impair freight transportation.”

The passenger carrier also reprised an idea from the 1980s that was never adopted of establishing an Intercity Passenger Rail Trust Fund.

If Amtrak gets its way, Railroad Rehabilitation and Improvement Program loans would be easier to obtain and states would be allowed to spend a portion of their Highway Trust Fund money on passenger rail.

CP Won’t Get in Bidding War for KCS

April 30, 2021

Canadian Pacific CEO Keith Creel said this week that his company won’t engage in a bidding way to acquire Kansas City Southern.

Speaking to the North East Association of Rail Shippers, Creel said Canadian National has more resourcess to finance a more expensive deal.

He was referring to a bid of $33.7 billion that CN has made to buy KCS whereas CP has offered $29 billion

If CP loses out on acquiring KCS, Creel said that would leave CP as the smallest Class I railroad and force it to eventually would have to find a merger partner.

“We don’t want a bidding war and it’s not something we’ll participate in. And ultimately, it’s a war that we would not win,” Creel said.

Ciurrently, KCS is North America’s smallest Class 1 system.

Creel did not rule out cooperating with CN and KCS.

“Listen, anything’s possible. We’re reasonable people at Canadian Pacific,” Creel said. “Should that happen, we’ll do our best to represent our customers’ interest. Is it possible in some instances? Yes. Is it probable? I would suggest probably not.”

In the meantime, Creel said shippers should tell the U.S. Surface Transportation Board their concerns about how a CN-KCS combination would “snuff out” rail competition at a “multitude” of locations and eliminate CP’s friendly connection to KCS in Kansas City.

CN contends its acquisition of KCS will boost rail competition and it plans to keep all KCS gateways open.

CP has told federal regulators there are more than 340 shipper facilities on a combined CN-KCS system that are currently served by both railroads.

Many of these are concentrated in a 65-mile stretch in Louisiana between Baton Rouge and New Orleans.

CN has suggested it will address this issue and that might include selling the KCS line in the region to another railroad.

“When you’re already talking about divestiture from the very beginning to provide a remedy to enable a deal, I would suggest it’s a bit deeper. I would suggest that the customers care,” Creel said.

The KCS board of directors has already accepted CP’s offer and it now considering the CN offer.

If KCS changes its mind and accepts the CN offer, CP will have five days to respond. Creel said CP would likely give up trying to acquire KCS and keep a $700 million breakup fee from KCS.

By comparison, KCS’s total revenue for the first quarter was $706 million.

In the short term, Creel expects CN to be hindered by the “exorbitant” price it will pay for KCS, suggesting it could increase CN’s operating ratio as high as 75 percent.

“And then you get to a point where I can compete in markets, and share that cost advantage with my customers so that they can continue to grow whereas CN cannot,” Creel said.

However, Creek said CP and its customers will eventually be at a disadvantage from CN’s far larger system, forcing it to seek a merger partner.

Hedlund Nominated for STB Seat

April 30, 2021

Karen Hedlund has been nominated by the Biden administration for a vacant seat on the U.S. Surface Transportation Board.

She previously served as chief counsel for the Federal Highway Administration, and chief counsel and deputy administrator at the Federal Railroad Administration.

Hedlund most recently has been involved with development of the Gateway project in the Northeast Corridor and a high speed rail proposal in the Pacific Northwest.

At one time she was a co-chair of the American Public Transportation Association’s Commuter and High-Speed and Passenger Rail Legislative Subcommittee.

CSX Amends STB Petition in Pan Am Case

April 30, 2021

CSX this week amended its application to acquire Pan Am Railways in the wake of the U.S. Surface Transportation Board ruling that the transaction is a “significant” one that will receive close scrutiny from regulators.

The Class 1 carrier had sought to have the deal reviewed as a “minor” transaction that would have received less review.

In a statement, the STB said the CSX deal involves Class I and II carriers and therefore is significant but not major, which applies only to transactions involving Class I railroads.

The STB also noted the CSX acquisition of Pan Am could have a major effect on shippers’ competitive access to rail.

CN Elects 2 New Board Members

April 30, 2021

Canadian National has elected two new members to its board of directors.

Denise Gray is president of LG Energy Solution Michigan Tech Center while Justin Howell is a  senior investment manager at BMGI, which manages the assets of Cascade Investment.

Elected as chairman of the board was Robert Pace, president and chief executive officer of The Pace Group.

Also elected was Margaret McKenzie, who was appointed to the board in October 2020.

In a news release, CN said the election of Gray and McKenzie enabled the company to meet its goal of gender parity on the board a year earlier than planned.

The gender parity objective is part of the Class I’s environmental, sustainability and governance goals, which also include an update to board governance policies.

Those changes also called for reducing the board’s size to 10 independent directors plus the chief executive officer.

Reelected as CN directors were Shauneen Bruder, Julie Godin, Kevin Lynch, James O’Connor, Robert Phillips, Laura Stein, and CN President and CEO Jean-Jacques Ruest.

B&O GP30 Leading Through Akron

April 29, 2021

Baltimore & Ohio GP30 No. 6942 leads an eastbound through downtown Akron in the late 1960s. That the Erie Lackawanna passenger station off to the right and the Exchange Street bridge in the background.

Photograph by Robert Farkas